20-14-M Request for Clarification Responses

The following list is comprised of paraphrased Requests for Clarification (RFC) submitted by potential bidders or sub-bidders in writing via email, letter, and this form:

Request for Clarification (RFC) 20-14-M

These paraphrased questions and associated responses are not part of the contract documents and shall have no bearing whatsoever on the interpretation of the Standard Specifications, the Standard Plans, the Special Provisions, or the Plans. Nor shall they have any bearing whatsoever on the interpretation of other publications referenced therein.

Questions without answers may be posted here to indicate that we have received them before the deadline and we intend to respond. 

Last updated: 3/04/2021 9:50A.M.


Is the Quality Assurance or Quality Control portion open for this project? (RFC 24680 submitted 2/9/2021)

Quality Control is provided by the contractor and not hired by the County. Quality Assurance is provided by the County's Materials Laboratory. Response date: 02/17/2021


Is attending the prebid meeting mandatory in order to bid? (RFC 25063 submitted 2/24/2021)

No, we wanted to hold a pre-bid meeting to highlight in person the conditions of some of the most difficult sections to ensure contractors factor for this as a part of their bid, but attendance is not mandatory. Response date: 03/02/2021


Are we rechipping the already chipped section at the beginning of Pepperweed Road? (RFC 25064 submitted 2/24/2021)

Yes. For the purpose of bidding, the entire road including that section is proposed to be chipped. Response date: 03/02/2021


What allowances will there be if the contractor is unable to chip the steep grade? (RFC 25065 submitted 2/24/2021)

The contractor is expected to perform the full contract and develop a strategy to achieve success. This road and other similar roads have been chipped in the past. The solution to achieving full performance of the contract is up to the contractor. Response date: 03/02/2021


Is rock available on the east side? (RFC 25066 submitted 2/24/2021)

Rock supplies are not provided by the County. Whether it is obtained on the east or west side or trucked in, contractors are responsible for obtaining rock. Response date: 03/02/2021


Are we rechipping the already chipped section at end section of Pepperweed Road? (RFC 25067 submitted 2/24/2021)

Yes. For the purpose of bidding, the entire road including that section is proposed to be chipped. Response date: 03/02/2021


Areas that are crack sealed may bleed. Is the County prepared for that? (RFC 25068 submitted 2/24/2021)

Yes. Response date: 03/02/2021


The specs call for the project to be done east to west. Can it be west to east? (RFC 25069 submitted 2/24/2021)

The awarded contractor may propose a change to the sequence to the Resident Engineer and the Department will evaluate the request. Response date: 03/02/2021


Will Caltrans encroachment permits be needed? (RFC 25070 submitted 2/24/2021)

Yes. The parent permit for Mountain View (Location 5) has been obtained, but a contractor permit (Double Permit) will be needed from Caltrans. The contractor is responsible to obtain the double permit. A Traffic Control Plan and Water Pollution Control Plan will be required as part of the application.  Response date: 03/02/2021

With there being 20 plus % grades on the project, will the County allow the areas to be rolled by the gravel trucks in lieu of the rollers, due to safety concerns?  (RFC 25214  submitted 3/2/2021)

Use equipment for each operation according to those allowed by the specifications. Response date: 03/04/2021