23-29-C CSA 1 Tamarack Water Infrastructure Replacement

Sign Up for Project Updates

Receive notifications (addenda, bidding logistical updates, etc.) for this project by filling out a Request to be Added to the Planholders.

Everyone who has expressed interest in this project is available on the Planholders List(PDF, 263KB) (updated frequently).

Description

The work to be done consists, in general, of installing approximately 3,900 feet of High-Density Polyethylene (HDPE) water main along with the necessary appurtenances, replacing the function of the existing asbestos cement pipelines. The project also includes installing approximately 45 service connections with meters and meter boxes and installing five fire hydrants. This project contains additives including removing the existing storage tank, installing a new storage tank with other necessary appurtenances, installing an access road to the new tank, and installing pavement overlays in the project area.

The engineer's estimate range is $1,700,000 to $1,800,000.

Location Map(PDF, 258KB)

Vicinity-Map-CSA-1.png

Specifications and Plans

Notice to Bidders(PDF, 171KB) posted 4/02/2024

Plans(PDF, 11MB) posted 4/05/2024

Specifications(PDF, 12MB) posted 4/05/2024

Addendum 1(PDF, 1MB) posted 4/26/2024

Supplemental Information

Requests for Clarification Responses updated 4/26/2024

Pre-Bid Meeting

A pre-bid conference was held on April 16, 2024 at 10:00 a.m. Pacific Time on Zoom 

Pre-Bid Conference Agenda(PDF, 163KB)

Pre-Bid Conference Attendance(PDF, 373KB)

Pre-Bid Conference Notes(PDF, 279KB)

Bid on this Project

We encourage you to submit an electronic bid for this project. The Specifications describe how you can bid using the old paper process.

All bids are due before Thursday, May 2, 2024 at 2:00 p.m. Pacific Time.

Bid Opening and Results

Bids will be bid opened for this project:

Thursday, May 2, 2024 at 2:00 p.m. Pacific Time.

Zoom Link (Meeting ID: 891 0333 2132, Passcode:118301)

Zoom Phone: (253)215-8782

Questions

Ask a question about this project by submitting a Request for Clarification

Review responses to previously asked questions