The following list is comprised of paraphrased Requests for Clarification (RFC) submitted in writing using this form:
Request for Clarification (RFC) Form
These paraphrased questions and associated responses are not part of the contract documents and are provided as supplemental information. Questions without answers may be posted here to indicate that we have received them before the deadline and we intend to respond.
Last updated: 11/25/2026, 12:30 P.M. PT
Can firms propose for specific services for example Geotechnical Services, or does the consultant need to provide all services listed within the scope? (RFC 2634-1)
Consultants must be able to perform any or all services listed in the RFQ scope, and may retain subconsultants for other services required. Firms are encouraged to partner for potential subcontracting opportunities. Response date: 11/10/2026, updated 11/12/2026
Can you tell us how many firms you intend to select based on this RFP? (RFC 2634-2 submitted)
The County intends to select 5-7 firms, but reserves the right to select more or less depending upon the relative qualifications of the firms that propose. The final number of selectees will be determined based upon the review panels’ recommendations. Response date: 11/12/2026
The RFQ states that the County intends to engage a variety of consultants. Approximately how many consulting firms does the County anticipate selecting for on-call contracts under this RFQ? (RFC 2634-3 submitted)
This RFC was answered under RFC 2634-2. Response date: 11/25/2026
Would the County consider extending the SOQ submission deadline by two weeks, from December 4, 2026, to December 18, 2026, to allow firms additional time to prepare complete and responsive Statements of Qualifications? (RFC 2634-4 submitted)
RFQ Sec. 1 and 8 state a $6,500,000 aggregate for all agreements; Sample Agreement Art. 5.A states a $5,000,000 NTE Sum. Which amount governs, and is it shared among all on-call agreements awarded under this RFQ? (RFC 2634-5 submitted)
RFQ 5.2.i refers to the categories of services a firm proposes, and Agreement Art. 2.A ties eligibility to Appendix B. May a firm propose on a subset of the Attachment A categories? If so, how should the SOQ show this, and will mini-RFPs go only to firms qualified in that category? (RFC 2634-6 submitted)
Att. A Items 3-4 and 8: Is routine compliance monitoring and reporting in scope (WDR groundwater sampling, LFG perimeter probes under 27 CCR 20921, SEM/wellhead monitoring under SJVAPCD Rule 4642 and CARB LMR)? If it is under a separate contract, please identify it. (RFC 2634-7 submitted)
Att. A Item 2.B: Is operation and maintenance support for landfill gas collection and control systems (wellfield tuning, blower and flare support, condensate management) within the scope of this Agreement? (RFC 2634-8 submitted)
Agreement Art. 16.F-G: Please confirm these restrictions apply only to construction contracts for Projects on which the Consultant provided task order services, and that a Consultant holding a CA contractor's license may still bid other County construction projects it did not design or support. (RFC 2634-9 submitted)
RFQ 5.2.i: Is the four-year period measured from the SOQ due date (projects since Dec. 4, 2022)? Is there a maximum number of projects to list? (RFC 2634-10 submitted)
RFQ 5.2.i: May firms list (a) projects performed as a subconsultant, (b) design-build or construction-phase engineering projects, and (c) projects key personnel performed at prior employers, if clearly identified as such? (RFC 2634-11 submitted)
RFQ 5.2: Are there page limits, minimum font sizes, or file-size limits for each Part 2 PDF uploaded to Bid Express? May each PDF include a cover sheet or divider? (RFC 2634-12 submitted)
RFQ 5.2.b-c and Sec. 6 (do not submit more than requested): Are full resumes acceptable, or are summary profiles preferred? Should copies of licenses or subconsultant commitment letters be included or omitted? (RFC 2634-13 submitted)
RFQ Sec. 6 and Agreement Appendix F: Is there a required fee proposal template? Will fully burdened hourly rates by job classification be accepted, or is a Caltrans LAPM cost proposal with a CPA-audited indirect cost rate required? (RFC 2634-14 submitted)
RFQ Sec. 7 and Agreement Arts. 1.G, 10.B and 24 reference Caltrans LAPM and federal requirements. Is federal funding anticipated for any projects? If so, do DBE goals or LAPM Exhibit 10 forms apply, and which "federal forms" are required with task order proposals? (RFC 2634-15 submitted)
Att. B, Criterion E: How will "Knowledge of local conditions" be evaluated? Is a firm or subconsultant office in Fresno County or the Central Valley considered under this criterion? (RFC 2634-16 submitted)
RFQ Preface and Agreement Art. 5.A ("XX separate agreements"): How many consultant agreements does the Department anticipate awarding, and approximately how many firms will be shortlisted for interviews? (RFC 2634-17, RFC 2634-18 submitted)
This RFC was answered under RFC2634-12. Response date: 11/25/2026
RFQ Sec. 1: The sentence "The Projects may include, but are not limited to," appears incomplete. Please provide the intended project list and any task orders the Department expects to issue in the first 12 to 24 months. (RFC 2634-19 submitted)
RFQ Sec. 1 / Att. A: Which facilities will be served (e.g., American Avenue and closed disposal sites)? Will Southeast Regional Disposal Site or transfer station work be included? Is there a current on-call solid waste agreement; if so, with whom and when does it expire? (RFC 2634-20 submitted)
RFQ Sec. 1 and Agreement Art. 2.C: How will mini-RFP proposals be evaluated and ranked? Is the sealed fee considered in the ranking, or opened only for the top-ranked firm? (RFC 2634-21 submitted)
Att. B: The Criterion B description appears to include Criterion C text ("Demonstrated ability to work effectively...") and ends mid-sentence ("demonstrate understanding of all"). Please provide the complete descriptions for Criteria B and C. (RFC 2634-22 submitted)
Agreement Art. 22: Are field activities at County disposal sites (monitoring and sampling, surveying, construction observation) considered public works subject to prevailing wage? Must subconsultants be DIR-registered at SOQ submittal, at award, or before performing public works? (RFC 2634-23 submitted)
RFQ 5.2.d: Should the staff list include all firm employees or only staff proposed for the on-call, and should subconsultant staff be included? Since it becomes an Agreement exhibit, will it limit which staff may be assigned to task orders? (RFC 2634-24 submitted)
Att. A Item 10: What scope is anticipated for tipping fee studies (e.g., cost-of-service analysis, closure/post-closure funding, rate structure alternatives, Board adoption support)? Is a financial or rate-study subconsultant acceptable for this item? (RFC 2634-25 submitted)