24-02-C Jensen Avenue Improvements
Results
24-02-C was awarded to Avison Construction, Inc. on June 10, 2025.
A bid opening for this project was held on May 1, 2025 on Zoom.
Bid Summary(PDF, 181KB)
Everyone who expressed interest in this project is available on the Planholders List(PDF, 86KB).
Description
The work to be done consists, in general, of reconstructing approximately 1.5 miles of Jensen Avenue from West Avenue to Fig Avenue (also known as MLK Blvd). The road will be reconstructed using a Full-Depth Reclamation with Cement method. The road work includes construction of new curb ramps, adjusting sewer manholes, signage and striping, and other miscellaneous items. A new ductile iron water pipeline will also be installed, replacing an existing asbestos water pipeline to be abandoned in place. Coordination with City of Fresno Public Utilities Department will be necessary to arrange the tie-in to existing system. The pipe replacement also involves installation of new water meters, fire hydrants, valves, and other appurtenant work. Some Fresno Metropolitan Flood Control District (FMFCD) master storm drain facilities shall also be installed as part of the work.
The DBE goal is 17%.
The engineer's estimate range is $5,850,000 - $6,500,000.
Location Map(PDF, 1MB)

Specifications and Plans
Notice to Bidders(PDF, 96KB) posted 4/01/2025
Specifications(PDF, 16MB) posted 4/04/2025
Plans(PDF, 13MB) posted 4/04/2025
Addendum 1(PDF, 1MB) posted 4/30/2025
Supplemental Information
Pothole Report(PDF, 11MB) posted 4/04/2025
Lead - Asbestos Report(PDF, 9MB) posted 4/04/2025
Cross Sections(PDF, 7MB) posted 4/04/2025
Requests for Clarification Responses updated 4/16/2025
Pre-bid Meeting
An optional pre-bid meeting on DBE goals and bidding logistics for this project was held on Wednesday, April 9, 2025 at 10:00 AM Pacific on Zoom.
Pre-Bid Agenda(PDF, 148KB) posted 4/8/2025
Pre-Bid Attendance(PDF, 103KB) posted 4/11/2025
Pre-Bid Minutes and Presentation Slides(PDF, 5MB) posted 4/11/2025