24-15-C CSA 1 Tamarack Water Infrastructure Replacement
Results
24-15-C was awarded on January 07, 2025 to DG Construction, Inc.
A bid opening for this project was held on November 21, 2024 on Zoom.
Bid Summary(PDF, 128KB)
Everyone who expressed interest in this project is available on the Planholders List(PDF, 266KB).
Description
The work to be done consists, in general, of installing approximately 3,900 feet of High-Density Polyethylene (HDPE) water main along with the necessary appurtenances, replacing the function of the existing asbestos cement pipelines. The project also includes installing approximately 45 service connections with meters and meter boxes and installing five fire hydrants. This project contains additives including removing the existing storage tank and installing a new storage tank with other necessary appurtenances within the same site, and installing pavement overlays in the project area.
The engineer's estimate range is $1,600,000 to $1,800,000.
Location Map(PDF, 258KB)

Specifications and Plans
Notice to Bidders(PDF, 126KB) posted 10/22/2024
Plans(PDF, 8MB) (9 MB) posted 10/22/2024
Specifications(PDF, 13MB) (13 MB) posted 10/22/2024
Supplemental Information
Requests for Clarification Responses updated 11/13/2024