Supplemental Information - Not Part of the Contract Documents
The following list is comprised of paraphrased Requests for Clarification (RFC) submitted by potential bidders or sub-bidders in writing via email, letter, and this form:
22-10-M Request for Clarification Form
These paraphrased questions and associated responses are not part of the contract documents and shall have no bearing whatsoever on the interpretation of the Standard Specifications, the Standard Plans, the Special Provisions, or the Plans. Nor shall they have any bearing whatsoever on the interpretation of other publications referenced therein.
Questions without answers may be posted here to indicate that we have received them before the deadline and we intend to respond.
Last updated: 08/26/2022 11:50 am
Will there be a pre-bid meeting for this project? (RFC 48627 submitted 8/3/2022)
No, there is no prebid meeting for this project. Response date: 08/03/2022
Considering the relatively small quantity of polyester concrete required at each location, will the Owner allow the Contractor to hand mix (small mixing drum) the polyester concrete in lieu of volumetric mixing? (RFC 48686 submitted 8/8/2022)
A volumetric continuous mixer shall be used to mix and place the polyester concrete regardless of quantity. Response date: 08/09/2022
Specification No. 12-4.02A(3)(b)
Due to the width of some of the bridges, will the county allow for full closure with detours in lieu of lane closure? The polyester paving equipment will not allow for traffic to navigate these narrow widths. (RFC 48888 submitted 8/19/2022)
We will assess the submitted equipment in light of the field conditions. We may make adjustments as needed. Response date: 08/24/2022
Drawing No. 2,3,11
I am having trouble understanding the asphalt quantity, the cold plane quantity, and the minor asphalt tons. These numbers don't seem to match what the drawings and no locations are given for minor asphalt repairs. Bid items 14,15,16 Also on drawing 11 you show a cluster of white P dots, why are they shown? Is this for bid item 17? (RFC 48897 submitted 8/19/2022)
See Addendum 2. Cold planing quantity was revised. Minor asphalt and place miscellaneous areas were consolidated into item 15. P-dots refer to the current item 17 non reflective marker (Type A). Response date: 08/26/2022