25-05-M BPMP Scour Mitigation (Withdrawn)
This project has been withdrawn with a plan to re-advertise with revisions to the plans and specifications and to allow for a more opportune work period. We will re-advertise the project later this year with the bid opening anticipated to take place in early 2026, with a construction start date of April 2026. All current planholders will be informed when the project is re-issued.
Everyone who has expressed interest in this project is available on the Planholders List(PDF, 270KB) (updated frequently).
Description
The work to be done consists, in general, of the maintenance of six (6) bridges through installing new or repairing existing scour countermeasures and conducting other maintenance activities at each location. Vegetation and trash will be removed from the channel at each location and a dead tree at Location 3 will also be removed. Vegetation and trash will be removed from the channels and twenty (20) trees will be removed at various locations as shown on the Plans and Specifications. The locations of work are as follows:
- Los Gatos Road over Los Gatos Creek (Bridge No. 42C0455)
- Los Gatos Road over Los Gatos Creek (Bridge No. 42C0458)
- Los Gatos Road over Los Gatos Creek (Bridge No. 42C0459)
- Excelsior Ave. over Fresno Slough (Bridge No. 42C0104)
- Excelsior Ave over Fresno Slough Overflow (Bridge No. 42C0367)
- S Alta Ave. over Travers Creek (Bridge No. 42C0179)
Federal Project Number: BPMP-5942 (240)
The engineer's estimate range is $3,900,000 to $4,300,000.
The DBE goal is twenty-one percent (21%).
Location Map - Los Gatos Creek(PDF, 2MB)
Location Map - Fresno Slough(PDF, 3MB)
Location Map - Travers Creek(PDF, 3MB)
Specifications and Plans
Notice to Bidders(PDF, 180KB) posted 7/15/2025
Specifications(PDF, 20MB)
(20MB) posted 7/17/2025
Plans(PDF, 12MB) posted 7/17/2025
Addendum 1(PDF, 371KB) posted 8/5/2025
Supplemental Information
Requests for Clarification Responses updated 8/5/2025
Revised Standard Plans 2015(PDF, 60MB) (60MB) posted 7/17/2025
Design Hydraulic Study Reports posted 7/17/2025
Geotechnical Design Memorandums posted 7/17/2025
As-Built Plans posted 7/17/2025
Environmental Information & Permits posted 7/17/2025
Pre-bid Meeting
County staff was available to discuss DBE and bidding logistics for this project:
Wednesday, July 23, 2025 at 10:00 A.M. Pacific on Zoom.
Pre-Bid Agenda(PDF, 139KB) posted 7/22/2025
Pre-Bid Attendance(PDF, 84KB) posted 7/25/2025
Pre-Bid Minutes and Presentation Slides(PDF, 1MB) posted 7/25/2025